A section of the Arkansas River Trail in Pueblo will close starting on or around December 1, 2026, when the Pueblo Conservancy District begins construction along the south levee, according to the City of Pueblo.

The project will replace old concrete slope paving and the hanging trail downstream of the G. Harvey Nuckolls Pedestrian Bridge. The city said the hanging trail has not been safe for emergency and maintenance vehicles for several years. It also said gaps have formed behind the slope paving, raising concerns about how stable and safe it will be over time.

While work is underway, the southside trail will be closed between the G. Harvey Nuckolls Pedestrian Bridge and the Moffat Trailhead. The city expects the closure to last about six months to one year, depending on how construction progresses and on project conditions.

The rest of the trail system will stay open. Walkers, runners and bicyclists can cross the river on the G. Harvey Nuckolls Pedestrian Bridge and use the Levee Trail on the north side, which will remain open for the whole project. That route still leads toward Runyon Lake and the Moffat Bridge. Detour signs will be posted, and the public is asked to obey closure signs and barricades and stay out of the construction zone.

The Conservancy District hired Miller Pipeline to do the work. Fees the district collects from property owners across Pueblo County are paying for the project. The City of Pueblo Parks and Recreation Department oversees the trail system.

People with questions about the project can call Jim Prioreschi, President of the Pueblo Conservancy District, at 719-557-1717, or email Miller Pipeline's Dillon Thurston at [email protected]. The Parks and Recreation Department answers trail questions at 719-553-2790.